Choky,
Zemgrish deciphered and understood. I have the capability of measurement, which as you said is pretty much necessary for a project like this. Otherwise, why even do it? Thank you for doing what you have done.
GG
Zemgrish deciphered and understood. I have the capability of measurement, which as you said is pretty much necessary for a project like this. Otherwise, why even do it? Thank you for doing what you have done.
GG
that one lost in translation 
I can think of 7 different answers I can give ......
🙂
pcbs are on the way to me , majority of parts I already have , rest ordered
main obstacle is regular 2-4 weeks period of pcbs being Customized, before reaching me
in this part of world , it seems that pcb factories in China are single logical source , again - having just quality in mind
I know Pa is having local source and PL/FW pcbs are top notch ; but , if I only compare size of Serbia vs. USA , no wonder that I don't have local vendor of same quality ; I have few (leftovers of now defunct big electronic companies) , but even in quantity prices are outrageous

I can think of 7 different answers I can give ......
🙂
pcbs are on the way to me , majority of parts I already have , rest ordered
main obstacle is regular 2-4 weeks period of pcbs being Customized, before reaching me

in this part of world , it seems that pcb factories in China are single logical source , again - having just quality in mind
I know Pa is having local source and PL/FW pcbs are top notch ; but , if I only compare size of Serbia vs. USA , no wonder that I don't have local vendor of same quality ; I have few (leftovers of now defunct big electronic companies) , but even in quantity prices are outrageous
pcbs are on the way to me , majority of parts I already have , rest ordered

Yes, some factories in China have not resumed work. Materials, electronic components, and materials have all risen. Prices have risen.
The good news,
when opening a box of 2SK182ES tonight,
when preparing to measure 2SK182ES,Found 2 boxes of THF-51S,
those who need THF-51S, can leave a message,
I have not paired yet
I need to pair again when needed
when opening a box of 2SK182ES tonight,
when preparing to measure 2SK182ES,Found 2 boxes of THF-51S,
those who need THF-51S, can leave a message,
I have not paired yet
I need to pair again when needed
Power Supply for Singing Bush
For all iterations , target positive rail is 60Vdc , plain logic and experience sez that's 48Vac secondary Donut
Schade (Full Mos) is having Iq in range of 3A/ch. ......... say 300VA Donut as minimum per channel
THF51/2SK180/2SK182 - having Iq in range of 2A2 , say 250VA Donut as minimum per channel
caps - 75Vdc rated, as minimum
cap bank for one channel - CRC fashion , 20mF-0R1/3W-20mF , as absolute minimum ; 30mF-0R1/3W-30mF is better ; more , the merrier
For all iterations , target positive rail is 60Vdc , plain logic and experience sez that's 48Vac secondary Donut
Schade (Full Mos) is having Iq in range of 3A/ch. ......... say 300VA Donut as minimum per channel
THF51/2SK180/2SK182 - having Iq in range of 2A2 , say 250VA Donut as minimum per channel
caps - 75Vdc rated, as minimum
cap bank for one channel - CRC fashion , 20mF-0R1/3W-20mF , as absolute minimum ; 30mF-0R1/3W-30mF is better ; more , the merrier
Yes, mono blocks.
Here is the heat sinks.
Here is the heat sinks.
Attachments
Last edited:
mmmmmmmmmm ....... Shiny!!

be sure to have some slits under the heatsinks
I heard lately that they're happier having some air circulating
🙂

be sure to have some slits under the heatsinks
I heard lately that they're happier having some air circulating
🙂
I don't have these , but I'm using stepped drills for years , and sort of Adjustable Circle Hole Cutter for even longer
of course that smaller and bigger bench drills are must
of course that smaller and bigger bench drills are must