The ultimate non-audio build thread

Wg-ski is doing his own plans too. The architect who normally does the plans and works with my builder hasn’t got back with me yet - probably too “busy” to deal with a project this “small” (in terms of dollars). The engineering drawings that come with the metal building kits are sufficient for permitting - even where I’m at now where they try to nickel and dime you for every cent they can. Out where this is going it’s the Wild West as far as codes go.

At last we have a transformer, so the site is hot now. Working on a way to get in and out of the trailer without breaking our *****. There’s enough PT stacked up under there to finish the other stair and build hand rails - after this rain event is over.
 

Attachments

  • 5EC1C94B-707F-4752-96A2-6BF93C7E37CC.jpeg
    5EC1C94B-707F-4752-96A2-6BF93C7E37CC.jpeg
    124.3 KB · Views: 93
  • 9B4116C5-C111-4A4F-9D23-A3576593562A.jpeg
    9B4116C5-C111-4A4F-9D23-A3576593562A.jpeg
    94.9 KB · Views: 96
  • 369D00FD-B26B-43AC-A57F-AC3F3CAC3872.jpeg
    369D00FD-B26B-43AC-A57F-AC3F3CAC3872.jpeg
    98.7 KB · Views: 97
  • Like
Reactions: 1 users
Actual dirt work - going on as I type. The building pads are supposed to be in place by Friday. It has finally been dry enough again.
 

Attachments

  • 4F3C1CE2-C02A-4918-A6C7-EB1A2984396E.jpeg
    4F3C1CE2-C02A-4918-A6C7-EB1A2984396E.jpeg
    115.6 KB · Views: 84
  • 116668AB-EC7E-4E61-B00C-C62FFA454576.jpeg
    116668AB-EC7E-4E61-B00C-C62FFA454576.jpeg
    93.6 KB · Views: 75
Progress at last..

That dirt work got done back in mid January, then it rained cats and dogs again. Then ice - six inches of it in Feb! 2 weeks ago they actually got the septic installed, so the trailer is “legal” now. Been working on the French drain from the driveway area, now that the flooding and runoff patterns are clearly established. And just this AM - we have a contract on the concrete.
 

Attachments

  • 884D1B4E-1158-4636-8CCA-7C0655F59938.jpeg
    884D1B4E-1158-4636-8CCA-7C0655F59938.jpeg
    74.5 KB · Views: 81
  • BA5D6EDF-820A-4772-AF65-7E81C2878FA9.jpeg
    BA5D6EDF-820A-4772-AF65-7E81C2878FA9.jpeg
    58.1 KB · Views: 72
  • 8521BA93-40FD-47D8-B9BC-F7D04C20D9A1.jpeg
    8521BA93-40FD-47D8-B9BC-F7D04C20D9A1.jpeg
    114.7 KB · Views: 79
  • 59A24F8D-D761-4415-946E-1FF9AE94F2E1.jpeg
    59A24F8D-D761-4415-946E-1FF9AE94F2E1.jpeg
    119.4 KB · Views: 80
  • Like
Reactions: 2 users
Yeah, it’s flat. It’s a gentle slope down from where the shop is in the back corner down to the creek at the back just beyond the tree line where the sprinklers for the septic go. Runoff actually runs off, as opposed to staying around for a week - which we fight at our place now. Going to put in the proper drains NOW so this doesn’t happen when the buildings are in.
 

Attachments

  • 663F2910-8BB2-492E-A962-614116A57E74.jpeg
    663F2910-8BB2-492E-A962-614116A57E74.jpeg
    100.8 KB · Views: 113
Is there a well?
County water. There was a meter out at the highway already. It had to be changed out of course because it didnt work not being used for God knows how long. 500 feet of 2 inch line was installed last year.

I hope to be complete in about 5 years. Or “complete enough”. That mobile home will be out of there as soon as I have AC, a working kitchen, laundry, and bath in the main house. Prior to move in, all the steel has to be up (so I have a barn and storage). And a mini-split in the back room of the shop, and the horse fence.

Not the final plans, but close. The final drawings are on the other computer (That doesn’t get used for entertainment).
 

Attachments

  • B4EFE1DD-5CFA-422A-A06B-488EC847EC8A.png
    B4EFE1DD-5CFA-422A-A06B-488EC847EC8A.png
    182.7 KB · Views: 80
  • 63538B2F-9122-4667-A734-7616F169FB2E.png
    63538B2F-9122-4667-A734-7616F169FB2E.png
    147.6 KB · Views: 79
  • 6238AC6D-9DAC-422F-9E5F-5A14E62131BC.png
    6238AC6D-9DAC-422F-9E5F-5A14E62131BC.png
    205.1 KB · Views: 85
  • Like
Reactions: 1 user
I’d like to put in about 12-18 kW worth of solar, but that’s probably 4+ years out. It will probably depend on how long I stay “working”. By doing this at all I’ve basically given them a 3 year commitment, but after that anything goes.

In this neck of the woods, more places frown on trailers than frown on Barndo’s. Where this is all going, anything goes. A mix of 50-100 year old 1000 sq ft homes, trailers, metal buildings, and 10-mil+ ranches. Most things spaced a quarter mile apart - developers haven’t discovered it yet. Although I still get two or three lowball offers on the land a week.
 
  • Like
Reactions: 1 user
Solar is “cool” for sure, just not sure it will benefit those of us who are in the second half of out lives. Return on investment is questionable if paying out of pocket.

That description of your demographic sounds like what my neighborhood used to resemble. Now it’s a combination of retail, four story apartment complexes, and new houses without yards, and vinyl siding that’s as thick as a matchbook cover.
 
More concrete - the house and the barn. The breezeway between still needs to be paved. And the shop has started….

Dry weather…. Dry weather…. Dry weather….. (does that work or am I wasting my breath?)
 

Attachments

  • 7C4855A6-EF60-4613-B282-8B8A9DCB5B81.jpeg
    7C4855A6-EF60-4613-B282-8B8A9DCB5B81.jpeg
    93.3 KB · Views: 64
  • E167C21A-3804-42A5-A1EC-88971DCC0EF1.jpeg
    E167C21A-3804-42A5-A1EC-88971DCC0EF1.jpeg
    91.6 KB · Views: 57
  • Like
Reactions: 1 users
There is now a shop, or at least most of one. Insulation guy still hasnt come out to spray it, or I would have brought a load of shop tools. And the house/barn has started. The part with the dirt floor on the left is the barn (2 horses, plus tack room). The breezeway in between will get paved when they finish all the framing.

The pile of PT lumber in the carport is the inside of the barn. That’s the fun job awaiting me in a couple weeks.
 

Attachments

  • 100A3FB8-A421-4697-A51D-6150C2FA2DFE.jpeg
    100A3FB8-A421-4697-A51D-6150C2FA2DFE.jpeg
    316.3 KB · Views: 66
  • 46D99272-4486-41FE-AF32-4B70D2CFF13E.jpeg
    46D99272-4486-41FE-AF32-4B70D2CFF13E.jpeg
    306 KB · Views: 57
  • 3662703A-5C06-4BE2-A22D-E632A91F2D6C.jpeg
    3662703A-5C06-4BE2-A22D-E632A91F2D6C.jpeg
    337.2 KB · Views: 63
  • 2365D767-F7A3-4CF5-BBDC-84046A8A5EB0.jpeg
    2365D767-F7A3-4CF5-BBDC-84046A8A5EB0.jpeg
    400.1 KB · Views: 58
  • Like
Reactions: 3 users
Since you're building your house etc, why not run 4 x CAT6 (or whichever CAT you prefer) between all the rooms.+ buildings? One for general network, one for CCTV, one for alarm and one spare for the future.
That and a separate power lines for audio are on my shortlist if i ever build my house.
 
Member
Joined 2019
Paid Member
This year was spent on a guest house, a pre-cut kit
They have a long and interesting history going back to colonial times when they were shipped out to Australia flatpack. More modern there are Huf houses. At my time of life I'm unlikely to have a house built, but a Huf looks mighty tempting. There was a program on UK Channel 4 "Grand Designs" where a UK couple had one assembled for them in (IIRC) a week.
 