Mitchel, I just want to follow up on the IM I sent you regarding a changed order and confirmation of shipping cost as a reply. Want to make sure you get the right money!
Cheers,
Graeme
id like to order two sets of each board, ie two ps boards, two speaker protect boards and two amp boards. im going to build the sc version.
can i get in or is it too late?
(im still finishing the es version using rudis boards but ive decided i want to go bi-amping). i also got side tracked designing an automatic 100-200v line power sensing circuit to use the right windings on my toroids without a switch...
can i get in or is it too late?
(im still finishing the es version using rudis boards but ive decided i want to go bi-amping). i also got side tracked designing an automatic 100-200v line power sensing circuit to use the right windings on my toroids without a switch...
Hello parb,
Please send me a private message, as I can still include your order. Don't forget to mention your name and location.
Please send me a private message, as I can still include your order. Don't forget to mention your name and location.
Hello,
I'm here to anounce that the group is closed ans that I have ordered the PCBs today. I expect to receive them in 9 business days. Then, I will prepare the boards for shipment, and send them to you.
If you have any doubts, please let me know.
I'm here to anounce that the group is closed ans that I have ordered the PCBs today. I expect to receive them in 9 business days. Then, I will prepare the boards for shipment, and send them to you.
If you have any doubts, please let me know.
Everything is under control, do not worry...soon we gonna have
these boards and Mitchel will ship them to you.
As soon as they arrive you gonna know.
regards,
Carlos
these boards and Mitchel will ship them to you.
As soon as they arrive you gonna know.
regards,
Carlos
We imagine boards will arrive next wednesday.
December 8th is the dead line to our side.
Then Mitchel will separate to produce packages and will put them, all together, at same time, into the postal system for delivery, not only to outside Brasil but also to our country too...around 60 kits where sold (cost price) and some extra boards where asked too.
Do not worry and be happy.... you will have your boards as soon as possible..i hope before Christmas.
regards,
Carlos
December 8th is the dead line to our side.
Then Mitchel will separate to produce packages and will put them, all together, at same time, into the postal system for delivery, not only to outside Brasil but also to our country too...around 60 kits where sold (cost price) and some extra boards where asked too.
Do not worry and be happy.... you will have your boards as soon as possible..i hope before Christmas.
regards,
Carlos
Fresh news.....boards will arrive next friday.
So, next week they will be organized to be sent.
regards,
Carlos
So, next week they will be organized to be sent.
regards,
Carlos
Are there extra boards available for purchase still?
I'd be interested in whatever I need to produce a stereo/2 channel amplifier.
I'd be interested in whatever I need to produce a stereo/2 channel amplifier.
Yes, but may delay some time, if pay pall is down
It had connections with Wikileaks....it may be "out of the air" for a while.
Let your order posted here:
http://www.diyaudio.com/forums/grou...charged-groub-buy-interest-6.html#post2394431
regards,
Carlos
It had connections with Wikileaks....it may be "out of the air" for a while.
Let your order posted here:
http://www.diyaudio.com/forums/grou...charged-groub-buy-interest-6.html#post2394431
regards,
Carlos
Blue boards are already in Rio de Janeiro...soon will start the distribution
Next week will start the shipment for you folks.
Visit the thread, i am giving other options to drivers:
http://www.diyaudio.com/forums/soli...mkii-supercharged-release-25.html#post2395224
regards,
Carlos
Next week will start the shipment for you folks.
Visit the thread, i am giving other options to drivers:
http://www.diyaudio.com/forums/soli...mkii-supercharged-release-25.html#post2395224
regards,
Carlos
Attachments
Mitchel uses to travel during the weekend.... relax dear Luke
Your boards are guaranteed...soon he will make contact with you.
regards,
Carlos
Your boards are guaranteed...soon he will make contact with you.
regards,
Carlos
Hello Guys,
As Carlos previously mentioned, I received the boards last weekend.
I already started to prepare everything for shipping, and I intend to ship everything this thursday, friday tops.
As Carlos previously mentioned, I received the boards last weekend.
I already started to prepare everything for shipping, and I intend to ship everything this thursday, friday tops.
I am sorry to say we may have some delay in blue board's shipment
Mitchell picked up one of these tropical diseases, a non specific virus
that tends to last, last, 4-15 days ... these things exist here, and usually willforce him to lie down in bed, with many pains in body joints, also inside and around bones , some average fever and some nausea.
This Will delay the blue boards shipment. we feel sorry... and i know he feel a lot sorry about that too... but we cannot predict nor prevent tropical diseases transmitted by mosquitoes during the summer, in special when
we live in tropical regions... although we fought continuously, using preventive measures to reduce water pockets, spraying poison to mosquitoes and hormons to make them loose interest to bite people, we do the ilimination of stagnant water ...and education to our people to avoid to have used old tires inside home, water pots and these things..we have inspectors visiting each home to make exams and to apply chemical materials to kill mosquitoe's eggs.... but the weather, the rains, in other words, region and climate, are crucial in such regard.
I guarantee you this is truth, you do not need to feel fear, to worry or have concerns about your boards arrival, as they will, for sure, arrive your place with some delay.
This is Dx Corporation, your uncle charlie guarantee!
regards,
Carlos
Mitchell picked up one of these tropical diseases, a non specific virus
that tends to last, last, 4-15 days ... these things exist here, and usually willforce him to lie down in bed, with many pains in body joints, also inside and around bones , some average fever and some nausea.
This Will delay the blue boards shipment. we feel sorry... and i know he feel a lot sorry about that too... but we cannot predict nor prevent tropical diseases transmitted by mosquitoes during the summer, in special when
we live in tropical regions... although we fought continuously, using preventive measures to reduce water pockets, spraying poison to mosquitoes and hormons to make them loose interest to bite people, we do the ilimination of stagnant water ...and education to our people to avoid to have used old tires inside home, water pots and these things..we have inspectors visiting each home to make exams and to apply chemical materials to kill mosquitoe's eggs.... but the weather, the rains, in other words, region and climate, are crucial in such regard.
I guarantee you this is truth, you do not need to feel fear, to worry or have concerns about your boards arrival, as they will, for sure, arrive your place with some delay.
This is Dx Corporation, your uncle charlie guarantee!
regards,
Carlos
Last edited:
- Status
- Not open for further replies.
- Home
- Group Buys
- DX BLame ES, ST, MKII, MKII Supercharged Groub Buy Interest