Anthony,
What is the current statis on this (heatsinks) GB?
Is the WiKi still open? (looks still open)
You have done so much hard work and calculations for this buy, it would be a shame if it turned into Vaporware........
I was hoping to purchase (4) 8" heatsinks non-drilled.
I know the smaller heatsink order was cancelled, was there ever an 8" option???? If not, I'd like to get in on the 10" buy. (I can cut them myself)
UPDATE STATUS PLEASE
Ron
What is the current statis on this (heatsinks) GB?
Is the WiKi still open? (looks still open)
You have done so much hard work and calculations for this buy, it would be a shame if it turned into Vaporware........
I was hoping to purchase (4) 8" heatsinks non-drilled.
I know the smaller heatsink order was cancelled, was there ever an 8" option???? If not, I'd like to get in on the 10" buy. (I can cut them myself)
UPDATE STATUS PLEASE
Ron
BobEllis said:I guess real life has overtaken our hobby.
Damn it! I hate it when that happens.
Bob, always informative.
Any ideas on an alternative for the F5 cooling???
(Conrad 35-151.5) with shipping is almost build prohibitive.
Ron
Certainly not wanting to P*$$ in this thread, but I just received an email from them about cost and shipping cost / times.
Conrad Heatsinks about the MF35-151.5 (*) are in US $
Costs in AUD (USD approx. 1.00 AUD=0.804952 USD ) with a choice of delivery options would be:
MF35-151.5 x 2 @ 53.36 ea. 106.72 (85.91)
Delivery 5.5 kg (Aus. Post Sea Freight 10 - 12 weeks) 35.75 (28.78)
Delivery (Aus. Post Standard Air 7-12 working days) 73.50 (59.17)
(Australia Post Economy Air no longer offered by Aus Post)
Payment options: credit card (Visa, Mastercard),
Paypal (in AUD to account sales@conradheatsinks.com ),
money order, etc.
Availability: in stock
Total cost per pair inc. shipping US $114.69 Time = 10 weeks
$30 more Time = 2 weeks
I'm leaning in this direction, sorry to say.
Ron
Conrad Heatsinks about the MF35-151.5 (*) are in US $
Costs in AUD (USD approx. 1.00 AUD=0.804952 USD ) with a choice of delivery options would be:
MF35-151.5 x 2 @ 53.36 ea. 106.72 (85.91)
Delivery 5.5 kg (Aus. Post Sea Freight 10 - 12 weeks) 35.75 (28.78)
Delivery (Aus. Post Standard Air 7-12 working days) 73.50 (59.17)
(Australia Post Economy Air no longer offered by Aus Post)
Payment options: credit card (Visa, Mastercard),
Paypal (in AUD to account sales@conradheatsinks.com ),
money order, etc.
Availability: in stock
Total cost per pair inc. shipping US $114.69 Time = 10 weeks
$30 more Time = 2 weeks
I'm leaning in this direction, sorry to say.
Ron
- Status
- This old topic is closed. If you want to reopen this topic, contact a moderator using the "Report Post" button.
- Home
- Group Buys
- Aavid Thermalloy Possible Group Buy