looks like mine's on it's way 🙂
https://docs.google.com/spreadsheet...QlE3R1B0TGZ6Z2hpbVhKN2ZpZ0E&usp=sharing#gid=0
https://docs.google.com/spreadsheet...QlE3R1B0TGZ6Z2hpbVhKN2ZpZ0E&usp=sharing#gid=0
Thank you
Thank you
THANK YOU!
So much stuff has been on hold because all I can think about is building the DAC 😀
Gonna be a fun xmas present!
Thanks again for all your efforts,
Mark
Thank you
THANK YOU!
So much stuff has been on hold because all I can think about is building the DAC 😀
Gonna be a fun xmas present!
Thanks again for all your efforts,
Mark
looks like mine's on it's way 🙂
https://docs.google.com/spreadsheet...QlE3R1B0TGZ6Z2hpbVhKN2ZpZ0E&usp=sharing#gid=0
Not fair mine s not 😀.
Just received the parts this morning !
Thanks a lot Korben.
Now it's time to turn on the soldering iron.
Thanks a lot Korben.
Now it's time to turn on the soldering iron.
Worth a visit here before start soldering: http://www.diyaudio.com/forums/digital-line-level/245233-build-thread-building-subbu-dac-v3-se.html
Especially Q2 is very tricky to solder and veeeeery sensitive to excessive heat applied. Pads should be done 1 mm wider.
Especially Q2 is very tricky to solder and veeeeery sensitive to excessive heat applied. Pads should be done 1 mm wider.
Nice to know Korben that things are moving forward again. No hurry with my package, I won't be starting the build before late January / early February.
Hi All
I've shipped 26 parcels today (S4 status), 2 others are completed (S3 status).
Thanks for your kind words 😉
For your information :
1 - There's 1 bag for DAC components
2 - 1, 2 or 3 bags for PSU components, labelled 1/3, 2/3 and 3/3 (depends on qty ordered)
3 - Each bag has been checked 3 times by 2 different persons
4 - I've labelled most of parts, tricky to write on C34 (0603 smd)
5 - Be carefull when you open your bags 🙄
6 - For those who had subscribed a Tracking Option, it takes some times to be notified on the Web site.
More to come soon I hope
Regards
Phil
I've shipped 26 parcels today (S4 status), 2 others are completed (S3 status).
Thanks for your kind words 😉
For your information :
1 - There's 1 bag for DAC components
2 - 1, 2 or 3 bags for PSU components, labelled 1/3, 2/3 and 3/3 (depends on qty ordered)
3 - Each bag has been checked 3 times by 2 different persons
4 - I've labelled most of parts, tricky to write on C34 (0603 smd)
5 - Be carefull when you open your bags 🙄
6 - For those who had subscribed a Tracking Option, it takes some times to be notified on the Web site.
More to come soon I hope
Regards
Phil
Last edited:
Hello Phil,
I confirm reception of my envelope.
Thank you for the hard work!!
If you happen to be in Paris, I'll be glad to get you a drink!!
-
I confirm reception of my envelope.
Thank you for the hard work!!
If you happen to be in Paris, I'll be glad to get you a drink!!
-
Hello All -
I am back from my long business trip. I have received few PMs and will get them replied by end of the week.
Cheers!
Subbu
I am back from my long business trip. I have received few PMs and will get them replied by end of the week.
Cheers!
Subbu
kits arriving in the UK this morning.
Subbu, Jean paul and Phil, Thank you chaps. If any of you are near the Welsh borders anytime, I'll get you a jumbo portion of chips and a pint of ale.
Subbu, Jean paul and Phil, Thank you chaps. If any of you are near the Welsh borders anytime, I'll get you a jumbo portion of chips and a pint of ale.
Hi, parts arrived yesterday. Thank you very much!
Just started the easy part but the transformer is still missing...
Just started the easy part but the transformer is still missing...
An externally hosted image should be here but it was not working when we last tested it.
Hi All
25 parcels shipped today (S4 status).
All parts GB subscribers have parcels on their way 😉
I hope you'll be delivered soon.
Darshanjoschi : please wait a bit more for your order...
For Service Assembly subscribers, I'm out of time right now.
I'll do my best to solder DACs & PSUs within a couple of weeks.
Reminder
1 - There's 1 bag for DAC components
2 - 1, 2 or 3 bags for PSU components, labelled 1/3, 2/3 and 3/3 (depends on qty ordered)
3 - Each bag has been checked 3 times by 2 different persons
4 - I've labelled most of parts, tricky to write on C34 (0603 smd)
5 - Be carefull when you open your bags
6 - For those who had subscribed a Tracking Option, it takes some times to be notified on the Web site, about 24 or 48 hours.
More to come soon
Regards
Phil
25 parcels shipped today (S4 status).
All parts GB subscribers have parcels on their way 😉
I hope you'll be delivered soon.
Darshanjoschi : please wait a bit more for your order...
For Service Assembly subscribers, I'm out of time right now.
I'll do my best to solder DACs & PSUs within a couple of weeks.
Reminder
1 - There's 1 bag for DAC components
2 - 1, 2 or 3 bags for PSU components, labelled 1/3, 2/3 and 3/3 (depends on qty ordered)
3 - Each bag has been checked 3 times by 2 different persons
4 - I've labelled most of parts, tricky to write on C34 (0603 smd)
5 - Be carefull when you open your bags
6 - For those who had subscribed a Tracking Option, it takes some times to be notified on the Web site, about 24 or 48 hours.
More to come soon
Regards
Phil
Phil, you are indeed a Star 😀
Have a Good Christmas break http://files.diyaudio.com/forums/images/smilies/hohoho.gif a Happy New Year and of course a well earned break.
Many Thanks
Ian
Have a Good Christmas break http://files.diyaudio.com/forums/images/smilies/hohoho.gif a Happy New Year and of course a well earned break.
Many Thanks
Ian
Last edited:
- Status
- Not open for further replies.
- Home
- Group Buys
- "Subbu DAC V3 - ES9023/WM8804 SPDIF & Power Supply PCB" Group Buy