
pretty much normal thing , when doing dual-mono construction ......
..............................................................................
pretty much normal thing , when doing dual-mono construction ......
if everything is in one case , sole thing shared is mains cable and switch ..... and call it dual-mono
when done in separate cases , you have monoblocks
I like not having common PSU , shared between channels
Papa properly made SIT-1 amp , all other ones are plain sissy
![]()
How are your new psu pcbs coming along ZM?
Just ordered pair of Cinemag CMOQ-4HPC direct from Cinemag - $100 inc ship to UK
Don Audio had quoted 135,66€ inc tax and shipping
I'm waiting for a response from Cinemag ... for the same ...
Did anyone listen both types? 50% and 80%? 😀
Last edited:
I'm waiting for a response from Cinemag ... for the same ...
Did anyone listen both types? 50% and 80%? 😀
I think this is useful info on the advantages of higher nickel
http://cinemag.biz/application_notes/PDF/AN-104.pdf
Last edited:
I think this is useful info on the advantages of higher nickel
http://cinemag.biz/application_notes/PDF/AN-104.pdf
The difference, as in the diagram, is academic, but who knows, there are some of us who hear the differences at 10 exp -5 in distorsion. 😀
Attachments
yeah , especially Mighty Moi , whom elephant farted in both ears , few decades ago
lucky me, everything I make is HiEnd , for my ears

lucky me, everything I make is HiEnd , for my ears

yeah , especially Mighty Moi , whom elephant farted in both ears , few decades ago
lucky me, everything I make is HiEnd , for my ears
![]()
An externally hosted image should be here but it was not working when we last tested it.
I'm waiting for a response from Cinemag ... for the same ...
Did anyone listen both types? 50% and 80%? 😀
Please note that Cinemag has two emails, cinemag@cinemag.biz and cinemag@att.net
I had the most luck with cinemag@cinemag.biz even though supposedly the @att.net was setup because european customers had issues reaching it.
In my experience David replies within 24 hours during work days, but he did say that they are quite busy and that telephone is the preferred way to go.
I ordered the high-nickel ones, almost regretting it, could be the standard nickel ones have nicer sound. But next channels i build will use the standard nickel.
Please note that Cinemag has two emails, cinemag@cinemag.biz and cinemag@att.net
I had the most luck with cinemag@cinemag.biz even though supposedly the @att.net was setup because european customers had issues reaching it.
In my experience David replies within 24 hours during work days, but he did say that they are quite busy and that telephone is the preferred way to go.
I ordered the high-nickel ones, almost regretting it, could be the standard nickel ones have nicer sound. But next channels i build will use the standard nickel.
I emailed David at cinemag@att.net this afternoon about the errors on the website showing high nickel as suffix L and vice versa. He came back to me in a couple of minutes. It was he who took my telephone order. Nice guy to talk to. I could have sworn I read somewhere papa recommending the high nickel. Trying to find it.
I emailed David at cinemag@att.net this afternoon about the errors on the website showing high nickel as suffix L and vice versa. He came back to me in a couple of minutes. It was he who took my telephone order. Nice guy to talk to. I could have sworn I read somewhere papa recommending the high nickel. Trying to find it.
I'm waiting for 24 hours already. cinemag@att.net
Did David give a shipping date? I ordered a pair of high nickel three and a half weeks ago and I have not yet received notice that it has been shipped. At the time of ordering, I was told that they would be doing a production run in a couple of weeks and that USPS tracking information would be provided when the order is shipped.
Did David give a shipping date? I ordered a pair of high nickel three and a half weeks ago and I have not yet received notice that it has been shipped. At the time of ordering, I was told that they would be doing a production run in a couple of weeks and that USPS tracking information would be provided when the order is shipped.
I think he said a month
Did David give a shipping date? I ordered a pair of high nickel three and a half weeks ago and I have not yet received notice that it has been shipped. At the time of ordering, I was told that they would be doing a production run in a couple of weeks and that USPS tracking information would be provided when the order is shipped.
Nope.
This is what he said:
"we are scheduled to do a production run very soon"
I think they're waiting to get at least 20 orders and then make them all .
He knew exactly why I need this.😀Thank you for your patience and persistence. I have been tied up in endless engineering meetings. The CMOQ-4HPC (I assume that you need this one for the Pass Labs project) has high-nickel laminations and printed circuit pins.
is that Pass Labs project ?
![]()
Obviously it has a connection with the percentage of nickel.
🙄
- Home
- Amplifiers
- Pass Labs
- SissySIT