The protection board has been tested to full functionality, but there are one or two small bugs that needed fixing.
We have ordered new boards and they are on their way to Alexis for him to verify (build & test).
Once it is bug free we'll make it available.
Since it is only one per case, Dave's supplier is too expensive with tooling charges etc., so we'll support a GB directly from Mark.
I think you now have everything to get started -- case about to come, PCBs GB arranged, schematics & Bill of material released....
Dave will start a Build Thread at the Pass Forum soon (he promised).
![Wink ;) ;)](data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7)
Hope it's clear,
Patrick
We have ordered new boards and they are on their way to Alexis for him to verify (build & test).
Once it is bug free we'll make it available.
Since it is only one per case, Dave's supplier is too expensive with tooling charges etc., so we'll support a GB directly from Mark.
I think you now have everything to get started -- case about to come, PCBs GB arranged, schematics & Bill of material released....
Dave will start a Build Thread at the Pass Forum soon (he promised).
Hope it's clear,
Patrick
The protection board has been tested to full functionality, but there are one or two small bugs that needed fixing.
We have ordered new boards and they are on their way to Alexis for him to verify (build & test).
Once it is bug free we'll make it available.
Since it is only one per case, Dave's supplier is too expensive with tooling charges etc., so we'll support a GB directly from Mark.
I think you now have everything to get started -- case about to come, PCBs GB arranged, schematics & Bill of material released....
Dave will start a Build Thread at the Pass Forum soon (he promised).
Hope it's clear,
Patrick
This is getting exciting. Looking forward to Dave's Build Tread. BTW, is the a GB for transformers?
Board payments received from pchw, Horio, Alazira, johnwmclean, pmchoong, JBdV, and NicMac.
Keep them coming in guys, so we can get these things ordered (they take a month to fabricate).
Greg
Sent a few minutes ago.........
Thanks,
Ken.....
John,
Suggest you send the remaining subscribers a PM or email.
Not everyone is watching daily these days.
Thanks,
Patrick
An email has been sent to all remaining participants.
Come on guys, there’s still 9 more case payments needed, don’t let me get to the name and shame stage. ![Wink ;) ;)](data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7)
Hahaha. Spoken like a true local, I like it.![Big grin :D :D](data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7)
Fair dinkum on 'yer, and again--thanks for the effort.....
Hahaha. Spoken like a true local, I like it.
- Status
- This old topic is closed. If you want to reopen this topic, contact a moderator using the "Report Post" button.
- Home
- Group Buys
- Potential EUVL F5X designed case user distribution check