Some of the Batch 1 guys would be jealous ....
Indeed 😀
Besides the regulator heatsinks and the Delrin block terminal hole positions, have there been and other refinements between batch 1 and batch 2 chassis?
I’d be interested in the upgrades.
No major change. At least not mechanical.
But heat sinks are from us, and anodised.
And probably different looks for the PCBs.
Patrick
But heat sinks are from us, and anodised.
And probably different looks for the PCBs.
Patrick
No.
Batch 2 is very likely to be the last batch ever.
Too much stress and work for us, not enough reward (in terms of appreciation).
And we end up losing money for every batch. So even for charity, there has to be a limit.
If you are desperate to join, and you can convince us of your DIY capability, we might have a spare set.
Thank you for your interest in any case,
Patrick
Batch 2 is very likely to be the last batch ever.
Too much stress and work for us, not enough reward (in terms of appreciation).
And we end up losing money for every batch. So even for charity, there has to be a limit.
If you are desperate to join, and you can convince us of your DIY capability, we might have a spare set.
Thank you for your interest in any case,
Patrick
PM Sent.
No.
Batch 2 is very likely to be the last batch ever.
Too much stress and work for us, not enough reward (in terms of appreciation).
And we end up losing money for every batch. So even for charity, there has to be a limit.
If you are desperate to join, and you can convince us of your DIY capability, we might have a spare set.
Thank you for your interest in any case,
Patrick
What has been offered for Batch 2 is listed here :
http://www.diyaudio.com/forums/grou...case-2nd-batch-autumn-2012-a.html#post3044430
Please take your time to read this, the F5X and the F5X Build thread properly first, before you sign in.
The GB has already been closed, and the parts almost finished.
So you are on "waiting" list, to see if the extra's we made are all good or rejects (i.e. spare sets).
And we would like to be convinced of your DIY capability (so that we do not end up spoon feeding).
Thank you for your interest in any case,
Patrick
http://www.diyaudio.com/forums/grou...case-2nd-batch-autumn-2012-a.html#post3044430
Please take your time to read this, the F5X and the F5X Build thread properly first, before you sign in.
The GB has already been closed, and the parts almost finished.
So you are on "waiting" list, to see if the extra's we made are all good or rejects (i.e. spare sets).
And we would like to be convinced of your DIY capability (so that we do not end up spoon feeding).
Thank you for your interest in any case,
Patrick
What has been offered for Batch 2 is listed here :
http://www.diyaudio.com/forums/grou...case-2nd-batch-autumn-2012-a.html#post3044430
Please take your time to read this, the F5X and the F5X Build thread properly first, before you sign in.
The GB has already been closed, and the parts almost finished.
So you are on "waiting" list, to see if the extra's we made are all good or rejects (i.e. spare sets).
And we would like to be convinced of your DIY capability (so that we do not end up spoon feeding).
Thank you for your interest in any case,
Patrick
Patrick, I am a keen DIY-er, I built my first power amp 30 yrs ago using Hitachi MOSFETS, so I do not need spoon-feeding. I am building an F5 though I do have a problem with adj BIAS on one channel coz I accidentally shortened a gate to the + rail on one of the MOSFETs, bad sighting I guess.
Patrick, you can put me down for a potential spot too.
Minor cosmetic flaws not too important.
Have built the Aleph, DDDac and the QRV-08 headphone amp by P-A.
Minor cosmetic flaws not too important.
Have built the Aleph, DDDac and the QRV-08 headphone amp by P-A.
Both of you gentlemen kindly contact Gogowatch by email with your real name & postal address.
He will give you more details and put you on the waiting list.
This will be the last two we have in reserve, so no more new comers unless we (very unlikely) would do a third batch.
Also suggest you subscribe for everything we offer, as all the others did.
Thanks again for your interest,
Patrick
He will give you more details and put you on the waiting list.
This will be the last two we have in reserve, so no more new comers unless we (very unlikely) would do a third batch.
Also suggest you subscribe for everything we offer, as all the others did.
Thanks again for your interest,
Patrick
Another update.
Mechanical parts are ready, as I was told.
FET matching is done, just waiting for computer pairing.
We also have quotes for shipment costs.
New PCBs are alpha tested OK and will be ordered soon.
So won't be long .....
WK will inform you to collect final payment soon. 🙂
Thank you for your patience,
Patrick
Mechanical parts are ready, as I was told.
FET matching is done, just waiting for computer pairing.
We also have quotes for shipment costs.
New PCBs are alpha tested OK and will be ordered soon.
So won't be long .....
WK will inform you to collect final payment soon. 🙂
Thank you for your patience,
Patrick
Great news, many thanks! I was just talking about this last night with another member in GB2, saying that it must be soon...
Looking forward with anticipation,
bk
Looking forward with anticipation,
bk
Payment request before shipment
I'm glad that we are in final stage of delivering the cases.
We have a last minute offer, in this shipment, for an option of parts for the regulator,
2x MOSFET Pair (2SK3497+2SJ618)
2x PRP 1K 0.25W Quad
Total x4 MOSFET, x8 Resistors
Price HKD220/case
I'll send payment request of the balance by email shortly. Please let me know if you do not receive by email today.
Shipment will happen in May.
Thank you all for your patience.
Cheers,
WK
I'm glad that we are in final stage of delivering the cases.
We have a last minute offer, in this shipment, for an option of parts for the regulator,
2x MOSFET Pair (2SK3497+2SJ618)
2x PRP 1K 0.25W Quad
Total x4 MOSFET, x8 Resistors
Price HKD220/case
I'll send payment request of the balance by email shortly. Please let me know if you do not receive by email today.
Shipment will happen in May.
Thank you all for your patience.
Cheers,
WK
The 4x MOSFETs for the regulator are matched at 4A at heat sink temperature (working conditions).
The 8x 1k PRPs are also matched by a precision current source and voltmeter.
We basically just recover cost, matching rejects and labour.
Many many thanks to WK and Mark for all the donkey work.
It is really a lot or work ......
Patrick
The 8x 1k PRPs are also matched by a precision current source and voltmeter.
We basically just recover cost, matching rejects and labour.
Many many thanks to WK and Mark for all the donkey work.
It is really a lot or work ......
Patrick
A simple request from a Batch 1 subscriber:
Can I please order from XEN-audio one heat-sink/mounting hardware kit? Or is a GB needed?
Can I please order from XEN-audio one heat-sink/mounting hardware kit? Or is a GB needed?
If you (or anyone else for that matter) want anything from us that is not a GB, you can make an request by email.
If we can accommodate your request without too much effort, and you have the patience to wait, we shall try to help.
Since we supplied just about everything other then the Conrad sinks, I presume you only want the Conrad sinks.
These you can order from Conrad without machining.
All batch 2 parts are made as sets, so we do not have spare heat sinks lying around, if that is what you are after.
You may contact Mark direct by email and see if he has some cosmetic-defect heat sinks, if you don't mind, that is.
Or whether he can make a pair just for you, with the usual queuing for factory slot and setup charges.
Patrick
(on behalf of the team)
If we can accommodate your request without too much effort, and you have the patience to wait, we shall try to help.
Since we supplied just about everything other then the Conrad sinks, I presume you only want the Conrad sinks.
These you can order from Conrad without machining.
All batch 2 parts are made as sets, so we do not have spare heat sinks lying around, if that is what you are after.
You may contact Mark direct by email and see if he has some cosmetic-defect heat sinks, if you don't mind, that is.
Or whether he can make a pair just for you, with the usual queuing for factory slot and setup charges.
Patrick
(on behalf of the team)
Please also note that while the 2nd batch heat sink from us have the same size and thermal capability (test proven) as the Conrad sinks, they are not identical.
The fin geometry and pitch are slightly different, and our sink are anodised and not powder coated.
So if you wish to have an identical pair as your current ones, the only viable solution is to order from Conrad direct.
Maybe John can help, as he was the contact with Conrad for Batch 1.
Patrick
The fin geometry and pitch are slightly different, and our sink are anodised and not powder coated.
So if you wish to have an identical pair as your current ones, the only viable solution is to order from Conrad direct.
Maybe John can help, as he was the contact with Conrad for Batch 1.
Patrick
- Status
- Not open for further replies.
- Home
- Group Buys
- Potential EUVL F5X Case 2nd Batch, Autumn 2012