Assuming there are no other differences apart from higher wattage, and that there will be no problem with hole pitch diameter or resistor length, I don't think anyone could have any complain.
Great job Tea-bag!
I prefer resistors with more wattage
The boards are on their way from the Peoples Republic. I hope that custom's doesn't hold it up in Alaska.
The resistor sourcing went through okay. I had to order Takman's from two sources, which ran up my cost more. Such is life.
I have been getting the envelopes and customs forms signed. This makes it quicker to send them once they arrived.
I ordered extra, so if you did not get in on time, I will have quite a few more to get rid of.
The resistor sourcing went through okay. I had to order Takman's from two sources, which ran up my cost more. Such is life.
I have been getting the envelopes and customs forms signed. This makes it quicker to send them once they arrived.
I ordered extra, so if you did not get in on time, I will have quite a few more to get rid of.
Last edited:
The second round of the groupbuy is finished. It helps if you start with reading this thread :
http://www.diyaudio.com/forums/pass-labs/145201-building-symmetrical-psu-b1-buffer.html
Please checks posts of Tea-Bag. Every post of him has a link to the groupbuy etc.
Edit: sorry, Tea-Bags posts now only indicate that the groupbuy is over. Maybe just maybe he has some PCB's left.....
http://www.diyaudio.com/forums/pass-labs/145201-building-symmetrical-psu-b1-buffer.html
Please checks posts of Tea-Bag. Every post of him has a link to the groupbuy etc.
Edit: sorry, Tea-Bags posts now only indicate that the groupbuy is over. Maybe just maybe he has some PCB's left.....
Hey all.
Boards arrived yesterday. I was able to ship out 30 packages yesterday. Still have more to go.
Some of these will be delayed as I await a second package of takman resistors to make up for all the requests. I hope the resistors come soon.
I ordered a bunch of extra boards, so there are still plenty of them available.
Boards arrived yesterday. I was able to ship out 30 packages yesterday. Still have more to go.
Some of these will be delayed as I await a second package of takman resistors to make up for all the requests. I hope the resistors come soon.
I ordered a bunch of extra boards, so there are still plenty of them available.
Updating the spreadsheet that you guys see is not my first concern, lot of added work.
I mostly run by the paypal emails, then sort them into a different folder once ready to go. If I catch a break, I will post who got shipped in a bit. I didn't do this last time, I didn't want judgement on who got theres first.
I mostly run by the paypal emails, then sort them into a different folder once ready to go. If I catch a break, I will post who got shipped in a bit. I didn't do this last time, I didn't want judgement on who got theres first.
Okay,
I got everyone's boards shipped out, spare a few that I was told to hold on to.
So mark your calendars for when you think they should arrive.
I've got plenty of more boards available. about hypnotize and 30 or so Mesmerizes.
I've also got about 5 packages of PRP and 5 packages of Takman resistors left.
Happy building.
I got everyone's boards shipped out, spare a few that I was told to hold on to.
So mark your calendars for when you think they should arrive.
I've got plenty of more boards available. about hypnotize and 30 or so Mesmerizes.
I've also got about 5 packages of PRP and 5 packages of Takman resistors left.
Happy building.
Got my boards today
That could mean that mine is about to arrive
- Home
- Group Buys
- GB for DC coupled B1 buffer with shunt PSUs