So far have confirmed (Bold font) for RJHs:
A DHL packet is waitng to be collected, maybe boards arrived... 😉
- Damuffin 2 kits
- NanookII 5 kits (100V)
- Turbon 2 kits (100V) PAID
- msaywitz 2 kits (100V) PAID
- cmiu007 1 kit (100V) PAID
- davym 1 kit (100V)
- nanotuba 2 kits (100V) PAID
- olegsh 2 kits (100V) PAID
- reddish75 1 kit (100V)
- fregianmaria 2 kits (100V) PAID
- Groundloops 2 kits (100V)
- Seth Hensel 2 kits (100V) PAID
A DHL packet is waitng to be collected, maybe boards arrived... 😉
I've boards in my hands, now it's packing time.
I should be able to start shipping next week.
Regarding RJHs, I'll order them in 8 hours so hurry up paying/confirming.
Awesome! Thanks for the update! 😎
Hi everyone
With the bom i was going through it and i noticed that with c13 the preferred component is a mundorf 1uf 250v with a parts connexion code of MUNDORF-70326.
However on parts connexion that code is for a mundorf 1uf 600v cap, is this still a suitable cap? is this still fine?
With the bom i was going through it and i noticed that with c13 the preferred component is a mundorf 1uf 250v with a parts connexion code of MUNDORF-70326.
However on parts connexion that code is for a mundorf 1uf 600v cap, is this still a suitable cap? is this still fine?
However on parts connexion that code is for a mundorf 1uf 600v cap, is this still a suitable cap? is this still fine?
Yes, it's the right cap, the voltage rating on that position doesn't matter, 250V is already much higher than what is needed.
cool thanks for clearing that up for me.
Parts Connexion have run out of that type as well. Is there another cap that you would recommend?
Parts Connexion have run out of that type as well. Is there another cap that you would recommend?
Fine 🙂
Half of the packets have been shipped last saturday and the next the other half should ship.
Sorry for the lack of info but I'm pretty busy... this is my first week at my new workplace...
Half of the packets have been shipped last saturday and the next the other half should ship.
Sorry for the lack of info but I'm pretty busy... this is my first week at my new workplace...
Hello Dario, thank you.
The cards arrived yesterday.
Really good pcb, invoice, texture really good. As soon as I have some free time I start working on it.
Have a nice day and thanks again.
...and good listening to everyone.
..and sorry for my bad english ahahahah
The cards arrived yesterday.
Really good pcb, invoice, texture really good. As soon as I have some free time I start working on it.
Have a nice day and thanks again.
...and good listening to everyone.
..and sorry for my bad english ahahahah
Hi Dario, did you sent all the packages?
Sure, I've shipped all the remaining board this morning.
I've updated the spreadsheet with shipping date, please put an Y when boards arrive.
Last edited:
Do you have 2set?😀
Sure, PM me your data as per GB conditions.
Inviato dal mio Nexus 5 utilizzando Tapatalk
- Status
- Not open for further replies.
- Home
- Group Buys
- My_Ref Fremen Edition GB (fourth run)