Serviced and in perfect working order.
New tubes. Replaced electrolytic capacitors.
110V power supply.
Based in Italy.
Asking 350 €
New tubes. Replaced electrolytic capacitors.
110V power supply.
Based in Italy.
Asking 350 €
Nice!
Did you check that old RIFA? I have seen some exploded examples of those. I would replace it.
I would get it if it was local.
Did you check that old RIFA? I have seen some exploded examples of those. I would replace it.
I would get it if it was local.