Back in the 1980s I used one of these triacs to turn on a rack of 5 phase linear 400 without any problems. No snubbing and no sequencing of the power.
Turning this rack on dimmed the light in the entire building.
This one is rated for 25A continuous and 250A non rep surge in a TO3 footprint.
What I would do is use the relay timer module you linked to on ebay, if that's what you using, to trigger a triac.
Turning this rack on dimmed the light in the entire building.
This one is rated for 25A continuous and 250A non rep surge in a TO3 footprint.
What I would do is use the relay timer module you linked to on ebay, if that's what you using, to trigger a triac.
Attachments
Last edited: