hi - i am about to test my F5. I am planning the following steps
1)test the softboard unconnected
2) connect softboard -> transformer (unconnected secondary)
3) transformer -> v3 PSU. not connected to the F5 board. The question is if it is unconnected, how would the PSU discharge itself?
4) test L and R channel separately.
Would this strategy work? i got a light bulb tester widget.
thanks alot
Philip
1)test the softboard unconnected
2) connect softboard -> transformer (unconnected secondary)
3) transformer -> v3 PSU. not connected to the F5 board. The question is if it is unconnected, how would the PSU discharge itself?
4) test L and R channel separately.
Would this strategy work? i got a light bulb tester widget.
thanks alot
Philip