Hi Chris,
I hope that we will be ready for that in roughly 3 weeks. Probably not everyone at exactly the same time. We may choose to make partial invoicing and shipment, depending on the time it takes to assemble and test/adjust the complete production run.
I hope that we will be ready for that in roughly 3 weeks. Probably not everyone at exactly the same time. We may choose to make partial invoicing and shipment, depending on the time it takes to assemble and test/adjust the complete production run.
Hi Jens,
Perfect! I'm getting happy!!!
I think Kevin (kevinkr) needs to be in that first group for sure. He is time sensitive, so whatever you can do for him ...
-Chris
Perfect! I'm getting happy!!!
I think Kevin (kevinkr) needs to be in that first group for sure. He is time sensitive, so whatever you can do for him ...
-Chris
Thanks, Chris..
Yes, that is true, but there are others who got here before me.. 😀
I've further complicated things by switching from KiCad to OrCAD in midstream which has really slowed me down.. LOL
Yes, that is true, but there are others who got here before me.. 😀
I've further complicated things by switching from KiCad to OrCAD in midstream which has really slowed me down.. LOL
Okay Kevin,
I'll swap places with you then. 🙂
You actually have a pressing need for yours. I do too, but the need isn't as pressing.
-Chris
I'll swap places with you then. 🙂
You actually have a pressing need for yours. I do too, but the need isn't as pressing.
-Chris
Hi,
First 50 orders (with reservation for cancelled orders):
AndrewT 1
jcga 1
Ghianni 1
BlacK_Chicken 1
soongsc 2
Dieter12 1
kannan_s 1
Philipp23 1
mbrennwa 1
kevinkr 1
Mark Johnson 1
Microfast 1
jhenderson01075 1
cwtim01 1
diyaudnut 1
anatech 1
jan.didden 1
bk856er 1
PH104 1
nyt 1
jasse 1
jazid 1
etlasr 1
B&W_arthur 1
cddumat 1
Carl_Huff 1
AKN 1
Waltzingbear 1
Canvas 1
bmac_2780 1
casalobo 1
fonnesbek 1
lgo51 1
dennis h 1
duster1 1
PWatts 1
agdr 1
kasey197 1
PaulBC 1
CeeVee 1
NicMac 1
markus22ch 1
pete0 1
rephil 1
nlate 1
jwilhelm 1
robertlars 1
u40pcm1
Stajo 1
Anatech, I don't think kevinkr want to swap place with you 😉
First 50 orders (with reservation for cancelled orders):
AndrewT 1
jcga 1
Ghianni 1
BlacK_Chicken 1
soongsc 2
Dieter12 1
kannan_s 1
Philipp23 1
mbrennwa 1
kevinkr 1
Mark Johnson 1
Microfast 1
jhenderson01075 1
cwtim01 1
diyaudnut 1
anatech 1
jan.didden 1
bk856er 1
PH104 1
nyt 1
jasse 1
jazid 1
etlasr 1
B&W_arthur 1
cddumat 1
Carl_Huff 1
AKN 1
Waltzingbear 1
Canvas 1
bmac_2780 1
casalobo 1
fonnesbek 1
lgo51 1
dennis h 1
duster1 1
PWatts 1
agdr 1
kasey197 1
PaulBC 1
CeeVee 1
NicMac 1
markus22ch 1
pete0 1
rephil 1
nlate 1
jwilhelm 1
robertlars 1
u40pcm1
Stajo 1
Anatech, I don't think kevinkr want to swap place with you 😉
I got there well before Chris, but I was actually referring to others ahead of me. In any event it is not up to any of us, I assume the manufacturer will contact in the order received, of course that is not necessarily the case. In any event we are getting close and I look forward to getting mine whenever it happens to be available.
Looks great. Looking forward to get mine too.
But I don't mind waiting a week or two more if other people have more pressing needs.
But I don't mind waiting a week or two more if other people have more pressing needs.
Should be pretty soon I think.
Ralf the measurements are in the other thread, are you in the GB?
Ralf the measurements are in the other thread, are you in the GB?
I don't know if Jens has had a chance to do loopback testing on the actual shipping product yet. You never know ...
-Chris
-Chris
I wouldn't expect significant differences from production prototypes other than those expected from production (component) tolerances. I would expect performance from sample to sample to differ slightly, but all would meet the minimum performance requirements and most would surpass it to some extent.. Since they will be fully tested and calibrated before they go out the door, I am sure they won't go out the door until everyone at RTX is satisfied that they are right.
- Status
- Not open for further replies.
- Home
- Group Buys
- GB for RTX6001 Audio Analyzer with AK5394A and AK4490