Strafi Translam FaitalPro Tower Build

Status
This old topic is closed. If you want to reopen this topic, contact a moderator using the "Report Post" button.
Well back at it!

Next step is to glue the braces into the sub-modules, they are a tight fit so just some well placed glue suffices

10a8b2f080e650204a358afee6740438.jpg


013331e9e01d8023ea0f6036413b0b36.jpg


a7964ee99b619c6b5670bb92cdff1d43.jpg


16cf11db8148491c6241bacff50f1a8e.jpg


And the moment of truth...gluing the sub-modules together. I put together these 3/4" bar clamps to create the most clamping force.

2fa9480e53a44873c54e7ed345a54b49.jpg


All the sub-modules laid out and organized in order ready to glue

393f78e5fa18bdeef66ce284e8f38b96.jpg


a110e8b1b82053e2a05f016fee154477.jpg


Glued, doweled and clamped

23f94e089e876506996cabb52e0cd759.jpg


And out of the clamps

6bdfa88397b1333ac7d8939c356a8834.jpg


c30e3c639bf152c35911a808b56dee10.jpg


330eb148329a27728add88432ff1faac.jpg


This was enclosure A, will do enclosure B tomorrow.

Thanks,
Javad
 
This project has gone smoothly and I've gotten exactly the results I've been anticipating along the way, however in the glue up of cabinet A I feel the result wasn't perfect.

The issue is that I anticipated the sub-modules to be more flexible during clamping, and they are somewhat but not enough to get a perfectly flat interface. During the glue ups of the 6-layer sub-modules, inevitably some unevenness did occur. I tried to make up for this in brute force and there just wasn't enough of it. The result is I have 2 small gaps between two layers, I'm not thrilled with them however I found some Famowood that is the exact color of the Mahogany and it shouldn't be noticeable.

Regardless I didn't want to make this mistake on Cabinet B.

I devised a perfectly flat sanding platform using some cabinet grade Aruco plywood, to force the flatness in X and Y directions I screwed and glued 4" wide strips, and verified flatness with some large flat Tri-squares.

To the platform I attached adhesive backed 120 grit sandpaper

403e15498aca0da3933a7c19e75ee363.jpg


1f19cbb748e88aa266fc7af8e971fdd6.jpg


22e32d80a52a5c0d3f51c34fb26917c0.jpg


And then it was like an hour in the gym, definitely a good workout!

88095579c221ea55e2a01e647aaa6197.jpg


dfaf553f0e67ecdd92bf423352213462.jpg


Really thrilled with how well this worked out, I was able to create perfectly flat interfaces between the sub-modules for what should be a gap free glue up, will glue up Cab B in the morning.

And I have a huge flat sanding platform I can use in the future whenever I need it.

Javad
 
:up: :D I lucked up and scored some megabuck solid core fire rated entry doors ages ago that are flat, rigid as a billiard table, so done similar as it's easier, quicker than trying to get perfect 'anything' with most wood products without way more patience than I have and/or a serious investment in pro woodworking tools. Even with the tools, no way I would spend the time required to build speakers one layer at a time, just envy anyone who can/does.

Hope all the work winds up being worth the time/effort performance wise.

GM
 
Ok some high stakes work today, more and more "no turning back" steps to the build =)

Both cabinets sanded with 60 grit and smooth.

I decided to tackle the port openings before routering out the front baffle.

I realized recently that ther work I did to locate the port module put the port openings right inline with the alignment dowels, meaning dowels would be visible in the port opening. After mulling over some solutions, I decided to redo the port module components to locate the ports further outboard of the dowels. Was about an hour of work and I was back in business:

ee0630184d8c454375e59690da8c1099.jpg


f95a6b1390e65cfceb11f2ee5d64e7a3.jpg


The port tubes will be separate and held in place with a threaded rod and some fasteners, that way swapping out port tube length is trivial.tue port module attaches to the enclosure with 4 screws.

90435c46807d114f815bc268aef9c0be.jpg


1fadad9c2b841e4838bef90355f832b4.jpg


eba417a645ab939b48088b6d5bf6b3e9.jpg


With that work done, it's time to router the port openings, I made some small port tubes to press tightly into the module plate to act as a guide for the router bearing.

f2b6bfde39d2f08749e394177ebadc18.jpg


And wala. Things started out with a 1/2" hole to feed the router but through then slowly hogging out the hole.

0156157d6ea9c1efc45fdb1bc402e346.jpg


c8d48de3c420354f4cad92fdc17291ee.jpg


f474cc93bdc2e02d9694d2ff614c74cb.jpg


Turned out very nice, I'll be finishing the port openings off with a 3/4" round over once I glue on the bottom plate.

Tomorrow I router the drivers in.

Thanks!
Javad
 
Big progress today, pumped!

Started with the discs that will tie the dowel spine to each brace layer, the top layer cap doesn't go all the way through as the horn is too deep to allow the spine to go all the way to the top, this will tie that in separately with a flat brace that will also support the horn.

2aaff4a94aee02d3988beef86b78be41.jpg


41178417992322a48d5e13d1a08a375e.jpg


I've been pretty anxious about the driver cutouts, it's amazing how much vacuuming in the shop you can do as you put off the inevitable! =)

I used tape to hold the template down, but the usual wood working/carpet tape was too thin and weak, last thing I could afford would be the template moving at all. I ended up using high strength 3M foam tape, which was very secure

1e029abb891f08476dd9e7f689be8886.jpg


I used the following router setup
2d28069902ffefc8e876f683dd2cd47a.jpg


1cfcb8d2d6a712668093e05a6a2e9a64.jpg


I ended up cutting out the driver openings with a jigsaw, plunge routing through 1.25" of Mahogany just didn't work out, but the aluminum insert was a very accurate template to trace them cut from

c2ffe8cce44d289f8c563948fdf4dbe9.jpg


8233ed7578392cdc4660be2231fe56c5.jpg


d599ade76864401ccb74e2d7cae6a193.jpg


b22ba75f3272d077281fa101ace44cd7.jpg


0f757f1c3251f28a5befe3de37827bf1.jpg


5b5f721d7a97496c63850c4e502d9f2c.jpg


a9245aa8ac6c347f21efd60d4b8a6028.jpg


7aabf0c135420f7fe677c81e33f73f35.jpg


bdd03a35496287550ed947f02ae229b4.jpg


8197099501dda9f75dc366960487594b.jpg


And where things left off, things will go relatively quick from here, I should have drivers mounted and playing by the end of the week so I can start doing measurements.

957dd84acbbab95060c4b816036ecc98.jpg


Thanks!
Javad
 
Status
This old topic is closed. If you want to reopen this topic, contact a moderator using the "Report Post" button.