burnedfingers said:Can anyone suggest some decent operating points for a #37 tube line stage?
How about starting with the datasheet and using the 135Va-k point with say a 47k anode R? B+ = 340V, Rk = 2k2.
As good a place to start as any.
Or you could choke load it with a Hammond 156C and B+ = 160V
- Status
- This old topic is closed. If you want to reopen this topic, contact a moderator using the "Report Post" button.