Connect the secondaries in series.
Leave the centre taps unconnected, but insulated.
You now have 26.5-0-26.5Vac at the mains voltage when you took your measurements.
If you do need an LV supply use one 13Vac and the series connection. That series connection is @ PSU Zero Volts.
Leave the centre taps unconnected, but insulated.
You now have 26.5-0-26.5Vac at the mains voltage when you took your measurements.
If you do need an LV supply use one 13Vac and the series connection. That series connection is @ PSU Zero Volts.
- Status
- This old topic is closed. If you want to reopen this topic, contact a moderator using the "Report Post" button.