Long Overdue SE Build need help troubleshooting
So this is about 10 years in the making. This was a 2A3 that is about 10 years old.
Edcore Power
Electraprint TM3Kb outputs
Maple/Walnut base
Aluminum top plate
The wife picked out the blue color for me on the trannies. Hoping to have this done in a couple months.
Painted w/spay cans.
Thanks,
Jeremy
So this is about 10 years in the making. This was a 2A3 that is about 10 years old.
Edcore Power
Electraprint TM3Kb outputs
Maple/Walnut base
Aluminum top plate
The wife picked out the blue color for me on the trannies. Hoping to have this done in a couple months.
Painted w/spay cans.
Thanks,
Jeremy
Attachments
-
IMG_1339.jpg617.4 KB · Views: 386
-
IMG_1194.jpg667.8 KB · Views: 168
-
IMG_1193.jpg500.8 KB · Views: 372
-
IMG_1192.jpg547.9 KB · Views: 379
-
IMG_0391.jpg504.9 KB · Views: 377
-
IMG_0275.jpg706.5 KB · Views: 395
-
IMG_1198.jpg546.9 KB · Views: 159
-
IMG_1247.jpg454.8 KB · Views: 127
-
IMG_1248.jpg469 KB · Views: 154
Last edited:
More pics....
Need to attach, fine sand and rub the mirror finish on the base.
Install the board
run my wires and wire the jumpers.
I am running jumpers to the main top plate since I want the rectifier and 300B tubes mounted to the top plate.
Need to attach, fine sand and rub the mirror finish on the base.
Install the board
run my wires and wire the jumpers.
I am running jumpers to the main top plate since I want the rectifier and 300B tubes mounted to the top plate.
Attachments
Coming soon!
moto x3m
An externally hosted image should be here but it was not working when we last tested it.
moto x3m
Made some progress a year later.
Working to finish the tranny wiring.
View attachment 715878
View attachment 715879
View attachment 715880
Nice looking layout. Please finish it.
It’s alive!
First power up specs no tubes.
B- @260v
B+ @ .69v
Filament @4.98v
Slight hum in the chassis but at least no smoke.
First power up specs no tubes.
B- @260v
B+ @ .69v
Filament @4.98v
Slight hum in the chassis but at least no smoke.
Attachments
Last edited:
- Home
- More Vendors...
- Tubelab
- Long Overdue SE Build