DIY progress report

Ab Fab

Hmmmmm....... I asked Ms. Lo Tess Co-op want I was like to work with and she said "Lab Flab".......:bawling:
 

Attachments

  • labflab.jpg
    labflab.jpg
    34.9 KB · Views: 2,595
At least you were able to sit through it... :sleep:

Even though I love the cinematography, as a rule of thumb for most Tarkovsky films I watch, I use the following formula which describes viewing stamina;

T=4C, where T is running time in minutes, C is the number of 16oz. tumblers of piping hot coffee necessary for a successful conscious screening.

For values of T less than or equal to 180 minutes; drink all of the coffee at paced intervals. If, however, T exceeds 180 minutes drink the first 3 cups (48 oz) at 60 minute intervals, finishing with a brisk pouring the final 16 in your lap at T=181...:yikes:

It generally works..
 
The one and only
Joined 2001
Paid Member
OK El Pipe-O before Xmas. I promise!

ZV5? I have several designs in front of me and I have to
decide which gets the honor. Late January at best.

Crossover and Wayne's passive preamp w/ remote are in
the pipeline.

Looking back at 2002, it looks like we can manage a
project about every 2.4 months.

:cool:
 
yeahhh

mrothacher said:
Please say El Pipe-O and ZV5 will arrive in time for Christmas. Oh, please. Oh, please! Even a scant hint. A wayward schematic. Anything. I beg you.

Christmas break is when I get to do some serious DIYing.

...and wife and kids shall do what they want to (but not disturbing in diy....):D

i will go for designing final finish of X Soz and XBsoz, as making first tests with aleph X:bawling:


Ralf